All four platforms available

elan1 RUN · SUBSTITUTION

Replace a component without rebuilding the integration.

elan1 Run Substitution replaces one component of the AI stack, such as a model or vector store, with another that meets the same fusion.*/v1 contract. It follows nine steps with two human gates, H1 and H2, and is never autonomous. Applications keep calling the contract, so the integration does not need to be rebuilt.

Status: Available

Available now, in every elan1 Run subscription.

01What it does

Projects get archived, relicensed and acquired. Your integration should not notice.

A substitution starts from a recorded trigger: a licence change, an archived project, a CVE, an SLO breach, cost, your request, a scheduled upgrade, an outage or a failed substitution. Rollback is its own trigger. Scheduled changes ride an upgrade train with ten working days' notice.

  • A licence change
  • An archived project
  • A CVE
  • An SLO breach
  • Cost
  • Your request
  • A scheduled upgrade
  • An outage
  • A failed substitution

02Who it's for

Teams who must move off a component, and show what changed.

  • Platform teams who must move off a component quickly and show what changed.
  • SIs and GPU operators who run the same change across many tenants.

03How it works

Nine recorded steps. Two named people decide.

Step 5 belongs to the conformance suite. Step 7 opens into four parts: the proposal, H1, an elan1 Govern gate check and H2.

Scenario

Not started. Show the next step to begin; the walk stops for each named person.

elan1 Governgate check · Mode B07 · PROPOSE AND DECIDE01Triggerrecorded02Scope03Plan₹ first04Sandbox05Provesuite decides06Shadow7.1proposal7.2H1approver7.3Governgate check7.4H2decider08Promote09Recordledger row07 · PROPOSE AND DECIDEelan1 Governgate checkMode B01Triggerrecorded02Scope03Plan₹ first04Sandbox05Provesuite decides06Shadow7.1proposal7.2H1approver7.3Governgate check7.4H2decider08Promote09Recordledger row
Diagram: the nine-step substitution with two human gates. H1 at step 7.2 and H2 at step 7.4 are named people; step 7.3 asks elan1 Govern.
  1. Step 1.

    Trigger, recorded with its reason.

  2. Step 2.

    Scope: the tenants and contracts affected.

  3. Step 3.

    Plan: the cost change, shown in rupees first.

  4. Step 4.

    Sandbox: the substitute runs against a copy.

  5. Step 5.

    Prove: the conformance suite alone decides. Red stops here.

  6. Step 6.

    Shadow: the substitute runs beside the live one: 72 hours for stateless and registered contracts, 7 days for indexed ones, a replay of at least 200 runs for in-flight work.

  7. Step 7.

    Propose and decide: four parts, two of them human gates.

  8. Step 8.

    Promote: only the Promoter, the one component that holds live credentials, applies the change.

  9. Step 9.

    Record: a ledger row. A substitution without a completed ledger row did not happen.

Illustrative specimen. Not customer data. The walk is simulated in this browser; in elan1 Run each step is recorded with its evidence.

04In the console

A substitution, as the console records it.

The record moving through nine steps, a plan closed at Gate 1 by a red blocking class, and the second human gate.

elan1 Run · Illustrative specimen/run/acme-in/substitutions/sub-0142
Illustrative specimen: the elan1 Run substitution record screen. A licence change found by the weekly audit, moving through nine steps from trigger to record, with the evidence for each step and who supplied it.
Substitution recordA licence change found by the weekly audit, moving through nine steps from trigger to record, with the evidence for each step and who supplied it.
elan1 Run · Illustrative specimen/run/acme-in/substitutions/sub-0137/gate-1
Illustrative specimen: the elan1 Run gate 1: blocking red screen. A substitute failed tenant isolation on the tenant's exact spec, so the plan closed. A red blocking class is never turned into a warning.
Gate 1: blocking redA substitute failed tenant isolation on the tenant's exact spec, so the plan closed. A red blocking class is never turned into a warning.
elan1 Run · Illustrative specimen/run/acme-in/substitutions/gate-2
Illustrative specimen: the elan1 Run gate 2: decide screen. The second human gate: proving run, shadow, cost and rollback evidence side by side before a named elan1 Run decider decides, in the Console only.
Gate 2: decideThe second human gate: proving run, shadow, cost and rollback evidence side by side before a named elan1 Run decider decides, in the Console only.

Illustrative specimen. Not customer data. Fictional sandbox data from the console design.

05What it connects to

Conformance at step 5. elan1 Govern at step 7.3.

Step 5 is Conformance. Step 7.3 asks elan1 Govern, over KernelPort in Mode B: evaluated and recorded. If Govern is unreachable, step 7 does not go ahead on a timeout. Writes go through elan1 Govern. An agent may draft the plan, but it holds no credentials and decides nothing.

Writes go through elan1 Govern.

06What it costs

Included in every subscription.

The unit

One node-year

Per node and per GPU. Runtime units are counted and shown, never priced.

Substitution is included in every elan1 Run subscription. Step 3 shows the cost change before anyone decides.

elan1 Run Substitution prices. Exclusive of GST.
WhatPrice · excl. GSTIncludes
Starter₹1,80,000 per year2 CPU nodes included
Standard₹6,00,000 per yearPlus nodes and GPUs under management
Sovereign₹24,00,000 per yearPlus nodes and GPUs under management
CPU node under management₹1,80,000 per node per year
GPU under management₹1,80,000 per GPU per year
Paid 90-day pilot₹4,50,000
A call refused at the edge40% of one governed action (₹0.64 at the L1 rate)Returns a 409 before the first token, so no token is sent

All prices are exclusive of GST. Prices are current list prices; GST is added at the applicable rate on the invoice.

What Substitution costs

All prices are exclusive of GST. GST is added at the applicable rate on the invoice.

07Status

Available now.

Our target: a live substitution with no change to consumer code, inside 72 hours. A target, not a measurement.

  1. Nine stepsTwo human gates, H1 and H2. Never autonomous.Status: Available
  2. Gate checkStep 7.3 asks elan1 Govern, over KernelPort in Mode B: evaluated and recorded.Status: Available

See what’s next

08What it does not do

What Substitution does not do.

  • It does not run without two named people.
  • It does not skip the proving run or the shadow.
  • It does not let an agent hold credentials or apply a change.
  • It does not read or move your business records.

09FAQ

Five direct answers.

// elan1 RUN · SUBSTITUTION

Replace a component without rebuilding the integration.

Start with a paid 90-day pilot: your stack behind the contracts, and a substitution taken through all nine steps.